Cart 0

Installing track Ceiling fix

Because easy track is made in a melamine board it is ideal for fixing into (don’t screw within 2cm of plastic track):

1. For plaster with ceiling joists: Locate the timber and simply screw through melamine track and plaster into timber behind. For long expanses without timber plugs should be used.

2. For contrete ceiling: Place track againt ceiling drill through melamine and mark ceiling, then plug, then lift track up again and screw up.

3. When calculating finished drop of curtains you should make an allowance of about 4cm including the thickness of the track from under existing pelmet to foor.(2.5+1.6 = 4-4.5cm) or from track to floor (2.5-3cm).

4. Track should be supported about every 650mm.

5. When calculating finished drop of curtains you should make an allowance of about 4cm including the thickness of the track from ceiling to foor.(2.5+1.6 = 4-4.5cm) or from track to floor (2.5-3cm).